Unifying sales, production, procurement, and finance
into one AI-powered supply chain optimization platform
Line Plan (LP), Production Plan (PP), Capacity Plan (CRP), Factory Plan (FP), Factory Schedule (FS), MRP II, and P&L — all computed at once. 250 min → 3 sec.
Mathematically models the entire factory with hundreds of variables moving simultaneously. Inventory, output, shipments, and costs are interconnected in real time.
WARP explores tens of thousands of parameter combinations to automatically find the plan that maximizes profit. Measured +11% profit improvement.
"What if demand increases 30%? What if a supplier shuts down for 4 weeks?" Get precise answers in under 1 second. 10 scenarios in 1 minute.
Revenue, cost, and profit are calculated simultaneously with the production plan. Instantly answers the executive question: "How much profit does this plan yield?"
Quantifies the impact of material lead-time changes, supplier disruptions, and demand surges before they happen. Respond before the crisis hits.
Ask "What's this week's revenue?" in natural language and get an instant answer. Run simulations, generate reports, and receive anomaly alerts — all through conversation.
Just connect your DB and AI analyzes the schema, maps entities, and calibrates parameters automatically. Start simulating with zero manual setup.
A proprietary architecture that unifies material requirements planning, production flow simulation, and AI optimization
Expands BOMs, calculates supplier lead times, capacity, and safety stock to automatically determine what to order and when.
Mathematically simulates the entire factory with hundreds of state variables. Material constraints and production dynamics are bidirectionally linked.
AI automatically searches for the parameter combination that maximizes profit, repeatedly running Layer 1+2 to find the optimum among tens of thousands of possibilities.
💡 Key differentiator: The bidirectional feedback loop between Layer 1 (MRP II) and Layer 2 (Simulation).
When materials fall short, production adjusts; when production changes, material orders update. This real-time integration is unique to WARP.
Production, finance, materials, optimization, and risk — all decisions on a single screen
Live WARP dashboards — 10 screens auto-tour
All KPIs at a glance — revenue, profit, delivery rate, utilization
Weekly revenue & profit trends, model performance, factory utilization
Revenue, cost, profit structure with model-level margin drilldown
30 models — material, labor, overhead breakdown and margin distribution
Gantt chart + Heatmap — line-model allocation and utilization
D3 simulation-based supply chain visualization — factory, line, model relationships
Process manufacturing dashboard — multi-industry support
Real-time DB, engine, and API health monitoring
Plus 30+ more — Executive reports, ERP integration, demand forecasting, MRP II, risk simulation, etc.