WARP Engine

Unifying sales, production, procurement, and finance
into one AI-powered supply chain optimization platform

What WARP Does

📋

Unified Planning

Line Plan (LP), Production Plan (PP), Capacity Plan (CRP), Factory Plan (FP), Factory Schedule (FS), MRP II, and P&L — all computed at once. 250 min → 3 sec.

🔄

Real-Time Simulation

Mathematically models the entire factory with hundreds of variables moving simultaneously. Inventory, output, shipments, and costs are interconnected in real time.

🤖

Auto-Optimization

WARP explores tens of thousands of parameter combinations to automatically find the plan that maximizes profit. Measured +11% profit improvement.

Scenario Analysis

"What if demand increases 30%? What if a supplier shuts down for 4 weeks?" Get precise answers in under 1 second. 10 scenarios in 1 minute.

📊

P&L Simulation

Revenue, cost, and profit are calculated simultaneously with the production plan. Instantly answers the executive question: "How much profit does this plan yield?"

🛡️

Early Risk Warning

Quantifies the impact of material lead-time changes, supplier disruptions, and demand surges before they happen. Respond before the crisis hits.

💬

AI Copilot

Ask "What's this week's revenue?" in natural language and get an instant answer. Run simulations, generate reports, and receive anomaly alerts — all through conversation.

🔌

One-Click Onboarding

Just connect your DB and AI analyzes the schema, maps entities, and calibrates parameters automatically. Start simulating with zero manual setup.

3-Layer Hybrid Engine

A proprietary architecture that unifies material requirements planning, production flow simulation, and AI optimization

Layer 1

Integrated Resource Planning (MRP II)

Expands BOMs, calculates supplier lead times, capacity, and safety stock to automatically determine what to order and when.

Layer 2

Production Flow Simulation

Mathematically simulates the entire factory with hundreds of state variables. Material constraints and production dynamics are bidirectionally linked.

Layer 3

AI Auto-Optimization

AI automatically searches for the parameter combination that maximizes profit, repeatedly running Layer 1+2 to find the optimum among tens of thousands of possibilities.

💡 Key differentiator: The bidirectional feedback loop between Layer 1 (MRP II) and Layer 2 (Simulation).
When materials fall short, production adjusts; when production changes, material orders update. This real-time integration is unique to WARP.

40+ Dashboards

Production, finance, materials, optimization, and risk — all decisions on a single screen

WARP Dashboard Tour

Live WARP dashboards — 10 screens auto-tour

Unified Portal

Unified Portal

All KPIs at a glance — revenue, profit, delivery rate, utilization

PSI Dashboard

PSI Dashboard

Weekly revenue & profit trends, model performance, factory utilization

P&L Analysis

P&L Analysis

Revenue, cost, profit structure with model-level margin drilldown

Cost Structure

Cost Structure

30 models — material, labor, overhead breakdown and margin distribution

Production Scheduler

Production Scheduler

Gantt chart + Heatmap — line-model allocation and utilization

Supply Chain Network

Supply Chain Network

D3 simulation-based supply chain visualization — factory, line, model relationships

Ethanol Portal

Ethanol Portal

Process manufacturing dashboard — multi-industry support

System Monitoring

System Monitoring

Real-time DB, engine, and API health monitoring

Plus 30+ more — Executive reports, ERP integration, demand forecasting, MRP II, risk simulation, etc.

See It for Yourself

In a 30-minute demo, see simulation results with your own data.

Request Demo